A facility manager reviewing a printed floor plan and a checklist at a desk
Home / Guides / What to Put in a Janitorial RFP and Scope of Work

What to Put in a Janitorial RFP and Scope of Work

The scope of work is the most important document in a janitorial contract. It's what contractors bid against, what their crews work from, and what you inspect against later. A vague scope produces bids that can't be compared and service that can't be measured. A clear one does most of the work of choosing a contractor for you.

Describe the building

Set frequencies by task, not just by visit

"Clean the offices five nights a week" leaves too much open to interpretation. List the tasks and how often each one happens: restrooms cleaned and restocked nightly, trash removed nightly, traffic lanes vacuumed nightly with full vacuuming weekly, horizontal surfaces dusted weekly, high dusting monthly. A task-and-frequency table is the format most contractors expect, and it's what makes two bids line up.

Separate routine work from periodic work

Carpet extraction, floor stripping and refinishing, window washing and similar periodic services are often priced separately from nightly cleaning. Say which ones you want, how often, and ask for them as separate line items. That stops one bid looking cheaper only because it left them out.

Spell out supplies and equipment

Who provides consumables — paper towels, toilet tissue, liners, hand soap — and who provides cleaning chemicals and equipment? If the contractor supplies consumables, ask for that as its own line so you can see it. If you have preferences on dispensers, product types or green-certified chemicals, say so here rather than after the contract starts.

Define access and security

Say how quality will be measured

State how often inspections happen, who does them, and how problems are reported and corrected — for example, a monthly joint walkthrough and an agreed response time for complaints. Without this, "the building doesn't look clean" is an argument rather than a process.

Ask every bidder for the same things

Asking every contractor for the same format is what lets you compare them on substance, rather than on how each proposal happens to be laid out.